![]() |
![]() | #1 |
Junior Member ![]() ![]() Join Date: Apr 2003 Location: yyz/buf
Posts: 17
| New Terminal Opens in Toronto
April 6th was the opening date of the new terminal in Toronto and it really is a wonderfull looking facility - bright, airy, uncrowded. The first international flight arrived from New Delhi at 06:00 hrs and 2 hours later the pax were still waiting for the baggage inspite of testing the system. Despite the terminal being opened for less than 2 hours, crews had the "Closed for maintenace" signs in front of the moving sidewalks allready. As for the old terminal one, the demoltion crews have already moved in to tear down the 40 year old terminal. This removal is necessary before the next stage of Terminal "New" can go on.
|
![]() | ![]() |
![]() |
Thread Tools | Search this Thread |
| |